Sign by bridge on Honopou Stream, Maui.This section outlines the current progress on the implementation of interim IFS for the 27 petitioned streams in east Maui. The following tables include, 1) the current status of the interim IFS for each stream; 2) simplified schematic diagram for each hydrologic unit; and 3) field investigation reports of site visits conducted to implement the interim IFS. Information is organized by hydrologic unit. To view information on a particular stream, please select the stream of interest below. (Note: CFS = cubic feet per second; MGD = million gallons per day)

Alo Stream Makapipi Stream Puoloa Stream
Haipuaena Stream Nuaailua Stream Wahinepee Stream
Hanawi Stream Ohia (Waianu) Stream Waiaaka Stream
Hanehoi Stream Paakea Stream Waikamoi Stream
Honomanu Stream Palauhulu Stream Waluaiki (East) Stream
Honopou Stream Piinaau Stream Wailuaiki (West) Stream
Kapaula Stream Puakaa Stream Wailuanui Stream
Kopiliula Stream Punalau/Kolea Streams Waiohue Stream
Kualani Stream Puohokamoa Stream Waiokamilo Stream

 

General East Maui Area

The following are information and field investigation reports that relates to the general area of East Maui, and not to a specific hydrologic unit.

Maps and Diagrams:

Field Investigations:

Apr. 6, 2009
  • Kula Agricultural Park (FI2009040601)
  • Apr. 7, 2009
  • Water Treatment Plants (FI2009040701)
  • Apr. 8, 2009
  • HC&S Sugar Operation (FI2009040801)
  • Jun. 22, 2009
  • Maui Land & Pineapple Company (FI2009062201)
  • Kula Agricultural Park (FI2009062202)
  • Top

    Honopou (6034)

    Simplified Unit Schematic

    Current Interim IFS:
    • Site A: 2.00 CFS (1.29 MGD), downstream of Haiku Ditch
    • Site B: 0.72 CFS (0.47 MGD), downstream of taro and domestic users

    Field Investigations:

    Oct. 23, 2008
  • Site A Flow Measurement (FI2008102301)
  • Site B Flow Measurement (FI2008102302)
  • Oct. 27, 2008
  • Site A Flow Measurement (FI2008102701)
  • Site B Flow Measurement (FI2008102702)
  • Interim Action at Haiku Ditch (FI2008102703)
    Video of interim action
  • Interim Action at Lowrie Ditch (FI2008102704)
    Video of interim action
  • Oct. 28, 2008
  • Site A Flow Measurement (FI2008102801)
  • Site B Flow Measurement (FI2008102802)
  • Oct. 29, 2008
  • Site A Flow Measurement (FI2008102901)
  • Site A Flow Measurement (FI2008102903)
  • Nov. 18, 2008
  • Site A High Flow (FI2008111807)
  • Nov. 19, 2008
  • Honopou at Haiku Ditch (FI2008111906)
  • Feb. 11, 2009
  • Site A Flow Measurement (FI2009021104)
  • Mar. 23, 2009
  • Low-Flow Bypass Channel (FI2009032301)
    Video of interim action
  • Jun. 23, 2010
  • Interim action at Wailoa Ditch (FI2010062301)
  • Jun. 24, 2010
  • Post-release flow measurement (FI2010062403)
  • Top

    Hanehoi (6037)

    Simplified Unit Schematic

    Current Interim IFS:
    • Site A: 0.89 CFS (0.57 MGD), downstream of Haiku Ditch on Puolua Stream
    • Site B: 0.63 CFS (0.41 MGD), downstream of Haiku Ditch on Hanehoi Stream
    • Site C: 1.15 CFS (0.74 MGD), upstream of Lowrie Ditch on Hanehoi Stream

    Field Investigations for Puolua (Huelo) Stream:

    Oct. 23, 2008
  • Site A Flow Measurement (FI2008102303)
  • Oct. 27, 2008
  • Site A Flow Measurement (FI2008102705)
  • Oct. 28, 2008
  • Interim action at Haiku Ditch (FI2008102803)
    Video of interim action
  • Site A Flow Measurement (FI2008102805)
  • Nov. 19, 2008
  • Site A Flow Measurement (FI2008111904)
  • Feb. 11, 2009
  • Site A Flow Measurement (FI2009021103)
    Video of interim action
  • Field Investigations for Hanehoi Stream:

    Oct. 24, 2008
  • Site B Flow Measurement (FI2008102401)
  • Site C Flow Measurement (FI2008102402)
  • Oct. 28, 2008
  • Interim Action at Haiku Ditch (FI2008102804)
    Video of interim action
  • Nov. 19, 2008
  • Site B Flow Measurement (FI2008111905)
  • Feb. 11, 2009
  • Interim Action at Haiku Ditch (FI2009021102)
    Video of interim action
  • Top

    Waikamoi (6047)

    Simplified Unit Schematic

    Current Interim IFS:
    • Waikamoi Stream:
              Wet season - 2.80 CFS (1.81 MGD), above Hana Highway
              Dry season - zero flow, above Hana Highway
    • Alo Stream: Status quo
    • Wahinepee Stream: Status quo

    Field Investigations for Waikamoi and Alo Stream:

    Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 4, 2010
  • Document Diversions (FI2010020401)
  • Jun. 23, 2010
  • Document Diversions (FI2010062302)
  • Field Investigations for Wahinepee Stream:

    Feb. 3, 2010
  • Document Diversions (FI2010020301)
  • Top

    Puohokamoa (6048)

    Simplified Unit Schematic

    Current Interim IFS:
    • Puohokamoa Stream: Status quo

    Field Investigations:

    Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 3, 2010
  • Document Diversions (FI2010020301)
  • Top

    Haipuaena (6049)

    Simplified Unit Schematic

    Current Interim IFS:
    • Haipuaena Stream: Status quo

    Field Investigations:

    Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 3, 2010
  • Document Diversions (FI2010020301)
  • Top

    Punalau (6050)

    Simplified Unit Schematic

    Current Interim IFS:
    • Punalau/Kolea Stream: Status quo

    Field Investigations:

    Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 3, 2010
  • Document Diversions (FI2010020301)
  • Feb. 4, 2010
  • Document Diversions (FI2010020401)
  • Top

    Honomanu (6051)

    Simplified Unit Schematic

    Current Interim IFS:
    • Honomanu Stream: Status quo

    Field Investigations:

    Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 3, 2010
  • Document Diversions (FI2010020301)
  • Top

    Nuaailua (6052)

    Simplified Unit Schematic

    Current Interim IFS:
    • Nuaailua Stream: Status quo

    Field Investigations:

    Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 3, 2010
  • Document Diversions (FI2010020301)
  • Top

    Piinaau (6053)

    Simplified Unit Schematic

    Current Interim IFS:
    • Piinaau Stream: Status quo
    • Site B: 5.50 CFS (3.56 MGD), downstream of Koolau Ditch but upstream of the Keanae Flume on Palauhulu Stream

    Field Investigations on Piinaau Stream:

    Dec. 10, 2008
  • Kaleiomaui tributary (FI2008121004)
  • Piinaau at Koolau Ditch (FI2008121005)
  • Feb. 10, 2009
  • Keanae Arboretum (FI2009021006)
  • Field Investigations on Palauhulu Stream:

    Oct. 24, 2008
  • Site B Site Selection (FI2008102403)
  • Oct. 28, 2008
  • Site B Flow Measurement (FI2008102806)
  • Nov. 17, 2008
  • Site B Flow Measurement (FI2008111701)
  • Interim action at Koolau Ditch (FI2008111702)
    Video of interim action
  • Nov. 18, 2008
  • Site B High Flow (FI2008111801)
  • Site B High Flow (FI2008111805)
  • Nov. 19, 2008
  • Site B High Flow (FI2008111902)
  • Dec. 9, 2008
  • Site B Flow Measurement (FI2008120901)
  • Feb. 11, 2009
  • Site B Flow Measurement (FI2009021105)
  • Top

    Ohia (6054)

    Simplified Unit Schematic

    Current Interim IFS:
    • Ohia Stream: Status quo

    Top

    Waiokamilo (6055)

    Simplified Unit Schematic

    Current Interim IFS:
    • Site A: 4.90 CFS (3.17 MGD), downstream of Koolau Ditch and near Dam 3 on Waiokamilo Stream
    • Kualani Stream: Status quo

    Field Investigations on Waikmailo Stream:

    Dec. 9, 2008
  • Waiokamilo at Koolau Ditch (FI2008120903)
  • Feb. 10, 2009
  • Waiokamilo Terminal Waterfall (FI2009021001)
  • Waiokamilo Stream at diversion dam (FI2009021003)
  • Waiokamilo Stream near dam 3 (FI2009021005)
  • Field Investigations on Kualani Stream:

    Nov. 18, 2008
  • Lakini Taro Patch and Kualani (FI2008111803)
  • Dec. 9, 2008
  • Kualani Stream, mauka (FI2008120904)
  • Top

    Wailuanui (6056)

    Simplified Unit Schematic

    Current Interim IFS:
    • Wailuanui Stream: 3.05 CFS (1.97 MGD), downstream of Koolau Ditch but above Waikani Falls

    Field Investigations:

    Oct. 24, 2008
  • Wailuanui Site Selection (FI2008102404)
  • Oct. 29, 2008
  • Wailuanui Site Flow Measurement (FI2008102902)
  • Nov. 18, 2008
  • Wailuanui High Flow (FI2008111802)
  • Wailuanui High Flow (FI2008111804)
  • Nov. 19, 2008
  • Wailuanui High Flow (FI2008111903)
  • Dec. 8, 2008
  • East Wailuanui Flow Measurement (FI2008120801)
  • West Wailuanui Flow Measurement (FI2008120802)
  • Wailuanui Site Flow Measurement (FI2008120803)
  • Dec. 9, 2008
  • Wailuanui Site Flow Measurement (FI2008120902)
  • Dec. 10, 2008
  • Wailuanui Site Flow Measurement (FI2008121001)
  • Interim action at East Wailuanui (FI2008121002)
    Video of interim action
  • Interim action at West Wailuanui (FI2008121003)
    Video of interim action
  • Feb. 9, 2009
  • Wailua Valley Taro Patches (FI2009020901)
  • Feb. 10, 2009
  • Wailua Valley Taro Patches (FI2009021002)
  • Feb. 11, 2009
  • Na Moku Project Taro Patches (FI2009021106)
  • Top

    West Wailuaiki (6057)

    Simplified Unit Schematic

    Current Interim IFS:
    • West Wailuaiki Stream:
              Wet season - 3.8 CFS (2.46 MGD), above Hana Highway
              Dry season - 0.4 CFS (0.26 MGD), above Hana Highway

    Field Investigations:

    Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 2, 2010
  • Document Diversions (FI2010020201)
  • Jun. 23. 2010
  • Document Diversions (FI2010062302)
  • Top

    East Wailuaiki (6058)

    Simplified Unit Schematic

    Current Interim IFS:
    • East Wailuaiki Stream:
              Wet season - 3.7 CFS (2.39 MGD), above Hana Highway
              Dry season - 0.2 CFS (0.13 MGD), above Hana Highway

    Field Investigations:

    Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 2, 2010
  • Document Diversions (FI2010020201)
  • Jun. 23, 2010
  • Document Diversions (FI2010062302)
  • Top

    Kopiliula (6059)

    Simplified Unit Schematic

    Current Interim IFS:
    • Kopiliula Stream: Status quo
    • Puakaa Stream: Status quo

    Field Investigations:

    Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 2, 2010
  • Document Diversions (FI2010020201)
  • Top

    Waiohue (6060)

    Simplified Unit Schematic

    Current Interim IFS:
    • Waiohue Stream:
              Wet season - 3.2 CFS (2.07 MGD), above Hana Highway
              Dry season - 0.1 CFS (0.06 MGD), above Hana Highway

    Field Investigations:

    Feb. 2, 2010
  • Document Diversions (FI2010020201)
  • Jun. 24, 2010
  • Document Diversions (FI2010062402)
  • Top

    Paakea (6061)

    Simplified Unit Schematic

    Current Interim IFS:
    • Paakea Stream: Status quo

    Field Investigations:

    Feb. 2, 2010
  • Document Diversions (FI2010020201)
  • Top

    Waiaaka (6062)

    Simplified Unit Schematic

    Current Interim IFS:
    • Waiaaka Stream: Status quo

    Field Investigations:

    Feb. 2, 2010
  • Document Diversions (FI2010020201)
  • Top

    Kapaula (6063

    Simplified Unit Schematic

    Current Interim IFS:
    • Kapaula Stream: Status quo

    Field Investigations:

    Feb. 2, 2010
  • Document Diversions (FI2010020201)
  • Top

    Hanawi (6064)

    Simplified Unit Schematic

    Current Interim IFS:
    • Hanawi Stream: 0.1 CFS (0.06 MGD), below EMI's main diversion (intake K-3)

    Field Investigations:

    Nov. 16, 2009
  • EMI Diversions (FI2009111601)
  • Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 2, 2010
  • Document Diversions (FI2010020201)
  • Jun. 24, 2010
  • Document Diversions (FI2010062402)
  • Top

    Makapipi (6065)

    Simplified Unit Schematic

    Current Interim IFS:
    • Makapipi Stream: 0.93 CFS (0.60 MGD), above Hana Highway

    Field Investigations:

    Nov. 9, 2009
  • Lower Makapipi Stream (FI2009110901)
  • Nov. 16, 2009
  • Upper Makapipi Stream and Diversions (FI2009111601)
  • Nov. 19, 2009
  • Site Selection with USGS (FI2009111901)
  • Feb. 2, 2010
  • Document Diversions (FI2010020201)
  • Jun. 24, 2010
  • Site Selection with USGS (FI2010062401)
  • Top